Developer for CTCP Plates positive working
20 liter cans
start with the basic adjustment prescribed by the plate manufacturer
Temperature: 22°C-28°C, start with 25°C
Processor speed: 20-40 seconds, start with 25 seconds
Replenishing rate with CTCP-HM3-R: 40-80ml/m2, start with 60ml/m2
Stand-still replenishing: 40-100ml/hour, start with 80ml/h
Replenishing rate can be dajusted with the conductivity
Storage: not under 6°C, not above 40°C
Shelf Life: 12 months
keep container tightly closed
keep away from direct sun light